Microsoft Project is a project management software that’s commonly used by project managers around the globe. However, that doesn’t mean it’s the best tool. This is why many Microsoft Project alternatives have been developed through the years.
As projects grow in complexity and workforces expand globally, the need for online project management tools is no luxury. There is no lack of MS Project alternatives to choose from, with varying degrees of usefulness and project management features. Microsoft has thrown its considerable weight into the ring with Microsoft Project. While MS Project has become an industry standard in project management, it comes with problems, leaving people to search for the best Microsoft Project alternative.
Why People Seek a Microsoft Project Alternative
Microsoft Project can do much of what you need when planning and managing a project, but it’s not a perfect tool. There are many reasons why people who use it are searching for Microsoft Project alternatives. Thankfully, there are many other project management solutions on the market that offer users a great alternative to Microsoft Project. We’ll get to those in a moment, but first, let’s outline the reasons people are dissatisfied with MS Project.
- Steep Learning Curve: Microsoft Project is not for beginners. The software is very technical and not user-friendly. That might be fine if you have an advanced degree in project management, but for the rest of us it’s going to require a lot of work, time and training to get a handle on how to use the tool. Why do that when you can simply use one of the best MS Project alternatives?
- No Mobile App: It’s hard to imagine a project management software in 2024 without a mobile app, but somehow Microsoft Project still doesn’t have one. This is going to severely limit your team’s ability to update tasks from the field. This may be reason enough to find an MS Project alternative for some.
- Poor Team Communication: Microsoft Project falls short in this category. You can’t easily message your team in the app, which means you’re going to have to jump onto one of the messaging tools that Microsoft offers, such as Teams, Outlook or Skype. Why do you want an add-on when it’s so much more efficient to choose a Microsoft Project alternative?
- Lack of Integration: While MS Project works okay with other Microsoft products, that’s not the case if you want to use a tool outside of the Microsoft family of apps. So, if you’re looking to integrate with Salesforce, Slack or other tools, you’re probably going to find yourself frustrated and looking for MS Project alternatives.
- High Price: If money is your bottom line, then Microsoft Project’s price tag will be a tough pill to swallow. What makes matters worse is that you have to pay for each license. You may have to selectively license MS Project to your team. Luckily there are low-cost and even free Microsoft Project alternatives in the market.
- Hard to Share Data: It’s almost as if Microsoft Project doesn’t want your team to work together. If anyone on your team works on an Apple product, they’re out of luck. It’s such a problem that a cottage industry of online tools has emerged that offer ways to take MPP files, convert them into friendlier formats to edit and share, then convert them back to MS Project files. That’s not very efficient!
2024 Best Microsoft Project Alternative Software Rankings
There are many Microsoft project alternatives in the market, and each of them has key features and characteristics that make them unique. The following list includes free, freemium, cloud-based or open-source options. Look through them and decide which is the best Microsoft project alternative for you.
1. ProjectManager
ProjectManager is online project and work management software that tops our list for its ease of use, competitive pricing and compatibility with Mac. This MS Project alternative helps you plan and schedule projects while delivering real-time updates with live dashboards and powerful reporting tools to continuously improve your performance and progress. Best of all, it’s collaborative at its core, connecting teams, no matter where or how they work or what they do in the organization. And, unlike some other options on this list, there’s a free 30-day trial so you can try it out.
Work How You Want
Not everyone works the same, which is why you get access to five different project views including Gantt, kanban, task list, spreadsheet and calendar. Teams that work in a traditional project management environment and agile project management teams can work together on the same tool with this MS Project alternative. Users can customize workflows and set task approvals, too. Updates are reflected across the software giving everyone one source of truth and keeping them on the same page and productive.
Get All the Robust Features, Plus Mac Compatibility
ProjectManager not only works on all Mac products but it does nearly everything that MS Project does, faster, easier and at a lower price point, which puts it at the top of the best Microsoft Project alternatives list. You can collaborate without jumping through hoops, manage schedules, resources, workload and much more. Once you use ProjectManager you might never go back to the clunky Microsoft Project again.
Seamlessly Import and Export MS Project Files
Unlike other alternatives on this list, ProjectManager offers a seamless import and export of MPP files. If some team members still use Microsoft Project, it’s never been easier to collaborate on MPP files and project plans. It’s so simple, you might just convince them to make the switch to this Microsoft Project alternative, too. There isn’t a more powerful, yet easy-to-use software in this Microsoft Project alternatives list. Get your free 30-day trial today!
ProjectManager Pros & Key Features
- Best Microsoft Project alternative for project management
- Multiple project management views
- Robust project planning, scheduling, tracking and resource management features
- Cloud-based project management software with unlimited file storage
- Can be used to view and edit Microsoft Project files (MPP files)
- Great alternative for project, program and portfolio management offices (PMOs)
- Free trial
- Mobile project management app for Android and iOS
ProjectManager Cons & Limitations
- Limited customization features
- Fewer integrations than other Microsoft Project alternatives in this list
- No free plan
Pricing
- Team: $13.00 user/month
- Business: $24.00 user/month
- Enterprise: contact sales for a custom quote
ProjectManager Reviews
- G2 review: 4.4 / 5
- Capterra review: 4.1 / 5
2. Smartsheet
Smartsheet is an online MS Project alternative that functions like a spreadsheet but adds collaborative features that connect teams. Its focus on collaboration means that the scheduling and task management features are lighter than some might want, but they’re not absent from the tool. It’s powerful like MS Project but more customizable, supporting automation.
However, because of its limited reach in terms of managing projects, users will have to spend extra to get such tools as time tracking, budgeting and resource management. There’s no real-time updates, and autosave can be a little slow, which is frustrating if you lose data before it has been saved. If you need advanced project management features, you’ll need to look for other MS Project alternatives.
Smartsheet Pros & Key Features
- Best Microsoft Project alternative for project management spreadsheets and templates
- Ideal for switching from Excel spreadsheets to project management software
- Files can be exported to Microsoft Excel and Microsoft Project
- Mac-friendly
- Free trial
- Mobile project management app for Android and iOS
Smartsheet Cons & Limitations
- Simple project management tools lack the functionality Microsoft Project offers
- Some features require spreadsheet formulas which add a steep learning curve to implementation
- Lack of resource management tools are a disadvantage when compared to other Microsoft Project alternatives
- Dashboards and reports aren’t detailed enough for project, program or portfolio management
- No free plan
Smartsheet Pricing
- Pro plan: $7 user/month
- Business plan: $25 user/month
Smartsheet Reviews
- G2 review: 4.4/5
- Capterra review: 4.5/5
3. Wrike
Wrike is an MS Project alternative that makes our list because it’s easier to use than Microsoft when planning, tracking and analyzing projects. It’s far more collaborative than MS Project, but then almost all the Microsoft Project alternatives on this list are too. You can easily invite freelancers, contractors, clients and teams from other departments into the tool for free, which is a nice touch.
Those planning and collaborative features are great, but you’ll need a good deal of time to get comfortable using them. Don’t forget to add training time to your projects to get everyone up to speed with using Wrike. That doesn’t mean it’s hard to use, just difficult to know which is the right plan for you to move forward with. There are the pricing tiers we outline below, but then they have industry-specific versions of the software that add to the confusion. It’s an expensive project management tool, with user minimums, which might stop users from even exploring it as an option.
Wrike Pros & Key features
- Best Microsoft Project alternative for planning
- Allows non-Wrike users to visualize projects, which is helpful for sharing projects with users without a Wrike license
- Gantt charts, calendars and task management boards
- Free trial
- Mobile project management for Android and iOS
Wrike Cons & Limitations
- Its feature set focuses more heavily on work management than project management
- Gantt charts lack important project management features such as cost and resource tracking
- Limited project tracking and reporting features compared to Microsoft Project
- High user minimums
Pricing
- Professional plan: $9.80 user/month
- Business plan: $24.80 user/month
Wrike Reviews
- G2 review: 4.2 / 5
- Capterra review: 4.3 / 5
4. Monday.com
Monday is a Microsoft Project alternative that is fun to use, which makes it nearly the polar opposite of Microsoft Project. Monday is a project management software that doesn’t feel like a project management software. It is easy to start customizing workflows, and it has automation to keep users aligned and updated on due dates. Agile users will love the kanban boards for task management and the custom dashboard that tracks progress in real time.
If all this sounds like a good MS Project alternative and you want to check it out, you’ll only have two weeks to play around with the trial version or use the free edition, which is limited to two users. That’s not really enough time to get a handle on an app. More a collection of customized spreadsheets than project management software, Monday might fall short of your management needs. For example, there’s no Gantt chart. The timeline they offer is a lightweight attempt to match the power of the Gantt There are no dependencies, for one, which is sure to cause headaches as you execute your project. But if you’re looking for simple MS Project alternatives, this could be it.
Monday.com Pros & Key Features
- Best Microsoft Project alternative for ease of use
- Ideal for beginner project managers and team leaders across industries
- Easy-to-use team collaboration features
- Mobile project management app for Android and iOS
- Free trial
Monday.com Cons & Limitations
- Its feature set is not robust enough for project, program or project portfolio management
- Project reports and dashboards are limited compared to Microsoft Project
- Limited project planning features, more geared towards task and workflow management
Monday.com Pricing
- Basic: $8/user/month, billed annually
- Standard: $10/user/month, billed annually
- Pro: $16/user/month, billed annually
- 3-seat minimum
Monday.com Reviews
- G2 review: 4.7/5
- Capterra review: 4.6/5
5. Asana
Asana is a great Microsoft Project alternative that organizes work across all your teams and makes sure everyone is always productive. It’s highly collaborative and tracks tasks and workflows, which makes it an ideal tool for task management. It’s flexible in that regard, and it has some of the best communication tools on this list, including video messaging that can be shared with the team. There are also multiple project views, including kanban boards, lists and calendar.
But, even with all its features and integrations, it still doesn’t mean Asana is a fully equipped Microsoft Project alternative. There are big holes in the platform. For example, there are no resource management tools, no budgeting and expense tracking and other things that project managers have come to expect in project management software. Projects that involve a lot of design work are not going to be happy that you can’t markup or proof visuals. But many will be won over by the design and flexibility when looking for Microsoft Project alternatives.
Asana Pros & Key Features
- Best Microsoft Project alternative for task management
- Friendly user interface and easy-to-use tools
- Ideal for team collaboration
- Mobile project management app for Android and iOS
- Microsoft project alternative with a free plan
- Free trial
Asana Cons & Limitations
- Its timeline view mimics a Gantt chart, but lacks important features such as cost and resource tracking
- Limited project management tools compared to Microsoft Project
- Overly simplistic features fall short for project planning, scheduling and tracking
Asana Pricing
- Premium plan: $10.99/user/month, billed annually
- Business plan: $24.99/user/month, billed annually
Asana Reviews
- G2 review: 4.3/5
- Capterra review: 4.5/5
6. Microsoft Planner
If you love Microsoft software, but feel that Microsoft Project is too much for you, then try Microsoft Planner. Glaringly there are no Gantt charts, but if that’s not an issue, then this might be worth a try. This Microsoft Project alternative is a lightweight task management tool that specializes in kanban boards and task lists. And to help grease the wheels of collaboration, there are email notifications and calendars for those that need a work management solution.
However, it’s a limited tool compared to Microsoft Project, and you’re certainly not going to get the planning and scheduling features of MS Project, much less its resource management and portfoilo management features. But, if you just need an online space to manage tasks with your team and you live in the Microsoft universe, try Microsoft Planner.
Microsoft Planner Pros & Key Features
- Best Microsoft Project alternative for Microsoft fans
- Simple team collaboration tools for effective communication
- Basic task management features, easy to grasp by most users
- Mobile app available for Android and iOS
- Free trial
Microsoft Planner Cons & Limitations
- Doesn’t offer Gantt charts, only kanban boards and task lists
- No workflow automation features
- Limited project management feature set
Microsoft Planner Pricing
- Microsoft 365 Business Standard: $12.50 user/month
- Microsoft 365 Business Premium: $22.00 user/month
Microsoft Planner Reviews
- G2 review: 4.2/5
- Capterra review: 4.3/5
7. Paymo
Paymo is comprehensive project management software with time tracking and invoicing capabilities so business owners and project managers can track project success. Its automatic time tracker makes Paymo a tough contender in the project management ring.
Task management is straightforward, with multiple assignees, priorities, customizable statuses, and project views including list, table, kanban, calendar and Gantt. There’s also an extra meta-Kanban view for a bird’s-eye view of your team’s tasks. This MS alternative is a great PM tool, but it has its limitations with third-party applications and can be complex and difficult to use.
Paymo Pros & Key Features
- Best Microsoft Project alternative for project and time-tracking
- Multiple project management views such as Gantt charts, task lists and kanban boards
- Good fit for small businesses thanks to its invoicing and payment processing features
- Mobile app for Android and iOS
- MS Project alternative with a free plan
- Free trial
- Mobile project management for Android and iOS
Paymo Cons & Limitations
- Limited project tracking and reporting features compared to Microsoft Project
- Project files can only be exported as PDF or PNG, which makes it difficult to export them to other platforms
- No workflow automation tools
Paymo Pricing
- Starter plan: $5.9/user/month paid annually
- Small Office plan: $10.9/user/month paid annually
- Business plan: $16.9/user/month paid annually
Paymo Reviews
- G2 review: 4.6 / 5
- Capterra review: 4.8 / 5
8. ClickUp
ClickUp is a project management platform for teams across industries such as marketing, product planning and software development. It offers similar features to Microsoft Project, including Gantt charts, kanban boards, task lists and dashboards. Additionally, ClickUp offers document editing, instant messaging and email management tools. One of the main advantages of this software is the variety of integrations with third-party software, which allows users to customize the software to fit their needs.
However, unlike Microsoft Project, ClickUp wasn’t exclusively designed for project management. As a result, some of its features are limited. For example, ClickUp’s Gantt charts don’t allow you to track project costs or the percentage complete of each task, and they don’t track the four types of dependencies that are used in project management. So while ClickUp it’s a versatile tool that can help you manage tasks, teams and workflows, it might not be the best Microsoft Project alternative.
ClickUp Pros & Key Features
- Best Microsoft Project alternative for productivity tools
- Multiple team collaboration tools, including a built-in email solution
- Flexible for teams across industries
- Kanban boards and dashboards are a good fit for scrum and agile teams
- Mobile project planning app for Android and iOS
ClickUp Cons & Limitations
- Feature variety is often overwhelming for most users, especially when setting up the software and onboarding team members
- Project management tools lack important features that Microsoft Project has
- Files can be only be exported in PDF format
- Missing project reports
- No free trial
ClickUp Pricing
- Unlimited: $5/user/month, billed annually
- Business: $12/user/month, billed annually
ClickUp Reviews
- G2 review: 4.7/5
- Capterra review: 4.7/5
9. GanttPRO
If you’re a small team in need of a Microsoft Project alternative with Gantt charts, GanttPRO may be right for you. Like Microsoft Project, its primary feature is the Gantt chart, and you’ll find that it’s fairly robust when it comes to planning and scheduling. And, when compared to Microsoft Project, it’s quite easy to use. Plus, there’s a kanban board feature for those who aren’t comfortable using the Gantt.
However, the Gantt is about all it does well. When it comes to tracking and reporting, it falls behind the pack. Furthermore, if you need to do billing or invoicing, you’ll have to rely on integrations to get it done. Unforutnately, its integrations aren’t very robust either, so you may find yourself using other tools in addition to this Gantt-heavy Microsoft Project alternative.
GanttPRO Pros & Key Features
- Best Microsoft Project alternative with a Gantt for small teams
- Files can be downloaded in a variety of formats
- Easy to view, share and edit files in other software
- Cost and budget tracking features
- Has a free 14-day free trial
- Has a mobile app available on iOS and Android
GanttPRO Cons & Limitations
- No timesheets, but there are time tracking features
- Limited project reporting features, no project health reports
- Few of integrations
- No free plan
GanttPRO Pricing
- Basic: $7.99/user/month
- Pro: $12.99/user/month
- Business: $19.99/user/month
- Enterprise: Contact sales
GanttPRO Reviews
- G2 review: 4.8/5
- Capterra review: 4.7/5
10. Trello
Trello is a tool that manages projects and helps teams collaborate. This software uses a kanban board interface that allows users to visualize their workflow. It provides transparency and fosters collaboration. It has real-time updates, which is definitely a plus and has easy onboarding for teams. It’s a fun and easy-to-use MS Project alternative, which is why it made it number five on our list.
But, as a fully-fledged Microsoft Project alternative, Trello falls short. It has a project bar chart instead of a Gantt. While that feature might try to mimic the usefulness of a Gantt it doesn’t set a baseline to track your actual progress against your planned effort, there are no inter-project dependencies and it can’t filter for the critical path in your schedule. Since it’s not the best project management software, Trello is recommended only for basic project management features.
Trello Pros & Key Features
- Best Microsoft Project alternative for kanban boards
- Mac-friendly
- Works for agile and scrum teams
- Wide variety of integrations
- Mobile project management app for Android and iOS
- Microsoft Project alternative with a free plan
- Free trial
Trello Cons & Limitations
- Limited feature set compared to most Microsoft Project Alternatives
- Lack of project management tools, only offers kanban boards and project calendars
- Most users need to purchase add-ons and integrations to get project management tools that are included in Microsoft Project
- Not suitable for project management offices (PMOs) or project portfolio management
Trello Pricing
- Standard: $5/user/month, billed annually
- Premium: $10/user/month, billed annually
- Enterprise: $17.50/user/month, billed annually
Trello Reviews
- G2 review: 4.4/5
- Capterra review: 4.5/5
11. Zoho Projects
Zoho Projects is a Microsoft Project alternative with kanban boards that organizes tasks, a social feed that captures updates on those tasks and forums for lengthier discussions. It definitely connects teams to foster productivity and even has a timesheet feature for managers to see how much time each team member spends on their tasks. It offers issue tracking and a Gantt project view.
What it lacks as an MS Project alternative are resource management tools and reporting. In a sense, a manager is flying blind if they can’t generate status reports and then reallocate resources to keep their teams working at capacity. There is also no function for managing more than one project at a time, leaving the tool limited in what it can do for users.
Zoho Projects Pros & Key Features
- Best low-cost Microsoft Project alternative
- Good fit for basic project management
- Mobile project management app for Android and iOS
- Free trial
- Free plan is available
Zoho Projects Cons & Limitations
- User interface could be improved for better navigability
- Gantt chart project tracking features are limited compared to Microsoft Project
- Lack of resource management features
- Hard to integrate with
Zoho Projects Pricing
- Premium: $4/user/month, billed annually
- Enterprise: $9/user/month, billed annually
Zoho Projects Reviews
- G2 review: 4.3/5
- Capterra review: 4.4/5
12. Teamwork
Teamwork is an easy-to-use Microsoft Project alternative. It organizes tasks and subtasks, labeling priorities and identifying dependencies to avoid bottlenecks. There are messages at the task level to connect teams as they work on their tasks and time tracking for managers to monitor progress. Like many Microsoft Project alternatives, it also features a Gantt chart view.
There’s a free version that has limited features. Reviewing all these apps shows the shortcomings of MS Project when it comes to teamwork, hence the name of this product. But the tool is not great for every type of collaboration. For example, you can’t mark up files, which is a problem if teams are working on visual materials. But it’s still miles ahead of MS Project and other alternatives.
Teamwork Pros & Key Features
- Best Microsoft Project alternative for team collaboration
- Great for basic task management
- Timesheet and invoicing features
- Free trial
- Mobile project management app for Android and iOS
Teamwork Cons
- Gantt chart features are good for basic task management but not ideal for project management
- Limited project reporting tools
- Designed for professional service providers, which is a disadvantage when compared to versatile Microsoft Project alternatives
- Paid versions have a 3-user minimum
Teamwork Pricing
- Starter $5.99/user/month, billed annually
- Deliver $9.99/user/month, billed annually
- Grow $19.99/user/month, billed annually
Teamwork Reviews
- G2 review: 4.4 / 5
- Capterra review: 4.4 / 5
13. GanttProject
GanttProject has one giant advantage over MS Project and even most of the Microsoft Project alternatives—it’s free. Gantt charts are the heavy lifters in project management and a free one is sure to be attractive. Especially one that’s easy to use and that can export documents to MS Project. That means this could prove a major asset to MS Project users.
That is also its deterrent. You’re still wedded to MS Project. Though, perhaps you’d use GanttProject all by itself to manage your project. After all, Gantt charts are great tools. The problem is that this Gantt is limited in what it can do. For this free MS Project alternative, you’re going to have to use a suite of other apps to get the project management features that MS Project offers.
GanttProject Pros & Key Features
- Best free Microsoft Project alternative for Gantt charts
- Open source Microsoft Project Alternative
- Easy-to-use Gantt chart
- Good for project planning
- Free plan
GanttProject Cons & Limitations
- Has a very limited feature set compared to most Microsoft Project alternatives in this list
- Lacks many project management features such as dashboards, kanban boards, workload charts, among others
- It’s a desktop-based software
- No mobile app
GanttProject Pricing
- Free downloadable software
GanttProject Reviews
- G2 review: 4.5 / 5
- Capterra review: 4.5 / 5
14. ProjectLibre
ProjectLibre is a free project management software that offers simple project management tools such as task lists, Gantt charts, project dashboards and resource management spreadsheets. Some of its key features include work breakdown structure (WBS) charts, resource histograms and network diagrams. It’s a downloadable open-source software that works on Windows, Mac and Linux computers, and it’s available in over 20 languages. One of its key advantages is that it can be used to view and edit Microsoft Project files without a Microsoft Project license.
However, while ProjectLibre promotes itself as the best Microsoft Project alternative, it lacks many of the tools that Microsoft Project offers such as timesheets, kanban boards or project management reports. On top of that, its project management features are limited and its user interface is outdated compared to the vast majority of Microsoft Project alternatives.
ProjectLibre & Key Features
- Best open-source Microsoft Project alternative
- Available in over 20 different languages
- Works on Mac computers
- Free plan
ProjectLibre Cons & Limitations
- Outdated user interface makes it hard to use and navigate the software
- Very limited feature set compared to Microsoft Project and most Microsoft Project alternatives in this list
- Limited spreadsheet-based resource planning tools
- Desktop-based software
ProjectLibre Pricing
- Essential: $45 per month, flat pricing
- Ultimate Control: $89 per month, flat pricing
GanttProject Reviews
- G2 review: 4.5 / 5
- Capterra review: 4.5 / 5
Which MS Project Alternative Is Right For You?
There are a lot of MS Project alternatives out there and for good reason. Microsoft has clunky, expensive and hard-to-use project management software. While it might be the default for many organizations, you don’t want to follow the crowd. Get a more nimble tool, one that’s easier to use, less expensive and fosters live collaboration.
Related Content
- Best Project Management Software: Rankings, Reviews & Comparisons
- Best Project Management Software
- Best Microsoft Planner Alternatives
- Best Monday.com Alternatives
- Best Smartsheet Alternatives
- Best ClickUp Alternatives
- Best Wrike Alternatives
- Best Asana Alternatives
ProjectManager is award-winning software that organizes tasks, teams and projects. It’s the best Microsoft alternative, with all the features and none of the frustration. You can use it to import and export MS Project files or better yet, abandon the expensive tool and subscribe to ours with multiple payment tiers. Try it free today.
The post Best Microsoft Project Alternatives: Free & Paid Options (2024) appeared first on ProjectManager.



2. Smartsheet












11. Zoho Projects
12. Teamwork