Project portfolio Archives - ProdSens.live https://prodsens.live/tag/project-portfolio/ News for Project Managers - PMI Thu, 14 Mar 2024 15:20:40 +0000 en-US hourly 1 https://wordpress.org/?v=6.5.5 https://prodsens.live/wp-content/uploads/2022/09/prod.png Project portfolio Archives - ProdSens.live https://prodsens.live/tag/project-portfolio/ 32 32 Lessons Learned in Project Management – How to Do It Right https://prodsens.live/2024/03/14/lessons-learned-in-project-management-2/?utm_source=rss&utm_medium=rss&utm_campaign=lessons-learned-in-project-management-2 https://prodsens.live/2024/03/14/lessons-learned-in-project-management-2/#respond Thu, 14 Mar 2024 15:20:40 +0000 https://prodsens.live/2024/03/14/lessons-learned-in-project-management-2/ lessons-learned-in-project-management-–-how-to-do-it-right

Every project provides valuable experience – positive as well as negative. The good news is that you can…

The post Lessons Learned in Project Management – How to Do It Right appeared first on ProdSens.live.

]]>
lessons-learned-in-project-management-–-how-to-do-it-right

Every project provides valuable experience – positive as well as negative. The good news is that you can derive new insights and benefits from both! In the end, every experience can be helpful for future projects – and thus contribute substantially to future successes. Yet, how can you consciously take up this knowledge, channel it and pass it on so that it provides a real benefit? A well-known method for this is Lessons Learned in project management.

The following chapters will address this method:

Note: Find an article on Retrospectives for Agile Projects here. This is the equivalent of Lessons Learned in traditional projects.

Let us begin with a definition of Lessons Learned.

Lessons Learned Definition

Lessons learned refers to the written documentation and systematic collection, evaluation and summarization of experiences, developments, tips, errors and risks from projects. Observing and avoiding these can prove useful for future projects. (Source: Wikipedia in German language)

By now, Lessons Learned has become an integral part of project portfolio management. When applied and implemented correctly, this method can be a part of your strategy for success!

Both in project management and in the PMO, the Lessons Learned method will support you in deriving insights from past project situations. What this means for new projects:

  • Avoidance of mistakes
  • Reduced risks
  • Seizing of opportunities
  • Increased project quality

Lessons Learned can be applied in different ways. This article will introduce you to an example of a proven approach.

Download now: Free eBook (PDF) on “The PPM Paradise”

Here is what an optimal customizable solution for project, portfolio and resource management (PPM) should be capable of – tips and important arguments for your decision-makers. > Download eBook (PDF) “The PPM Paradise”

How Is the Lessons Learned Method Applied?

There are many ways to apply Lessons Learned in project management. Which type of approach are you familiar with?

In my experience, Lessons Learned is often only practiced at the end of a project with a simple survey of the project team.

The two classic questions are:

  • What went well?
  • What went badly?

The respective answers tend to be similarly superficial, as the participants may:

  • Not be bold enough to say anything relevant.
  • Not have had or taken the chance to prepare anything.
  • Know that their statement will have no lasting effect.

Hence, this will often result in people saying what the others want to hear. Which usually is: “All went well.”

Obviously, Lessons Learned in project management can do more than that. However, it needs more room in the project. Otherwise, there will be no time to consciously apply Lessons Learned and thereby generate added value.

Sign up for our TPG Blog Newsletter now and never miss another blogpost.



Example of a Possible Approach

As previously mentioned, there are many types of Lessons Learned in project management. You will get to know one possible approach below. It is a methodology accompanying the whole length of the project – from start to finish.

The implementation consists of 4 phases:

  1. Informing and building the team
  2. Gathering phase
  3. Preparing the workshop
  4. Workshop
Lessons Learned in Project Management 1
Figure 1: The 4 phases of the Lessons Learned method

Phase 1: Informing and Building the Team

Inform your project team at the very beginning of the project that you will be applying the Lessons Learned method. This will foster transparency and understanding.

In the process, it is important to demonstrate or explain the way in which you will apply Lessons Learned.

In addition, you can use this address to inspire and motivate your team to use the method and to clear up any potential misunderstandings as well as to figure out the team’s expectations.

Subsequently, you will decide – depending on team size and structure – who will be counted as “actively involved”. You can do this alone but are equally welcome to decide this together with the team.

When building your team, make sure you include people from different areas of the project. This will enable you to capture diverse points of view.

Only those participants count as “actively involved” who take part in shaping the Lessons Learned and take on an active role. These can be selected individuals from the different project areas or the whole team. This depends on the situation and the size of the project team.

Our tip: Make sure the number of people does not end up being too high. After all, the same individuals will be the participants of the later workshop. In my experience, 3 to 10 people is a good size for a Lessons Learned team.

Phase 2: Gathering Insights

Throughout the whole project, you will be in the so-called gathering phase. During this time, every actively involved participant is called upon to document insights, experiences, impressions, etc. – positive as well as negative.

It is the collection of information that may have relevance for the subsequent Lessons Learned workshop.

To make it easier to gather information, a so-called logbook may be helpful. This is where you and your team can note down what happens on the project. This does not have to be too detailed, but it should briefly report the situation.

Our tip: The logbook can be a simple Excel table. For greater consistency, it makes sense for everyone actively involved to have the same logbook. Consider giving the logbook to the active participants symbolically as a little present. So far, this has always created a much more positive atmosphere. 😉

Log Book for Lessons Learned in Project Management
Figure 2: Lessons Learned template – Logbook for gathering insights during the project

Phase 3: Preparing the Workshop

The workshop is the centerpiece of this Lessons Learned method. Therefore, it requires sound preparation.

Alongside the organizational matters, such as workshop materials, booking the room, etc., the preparation of the contents and order of events is key.

You need to resolve one vital question:

What topics should be covered in the workshop in order to provide the greatest benefit and the highest relevance?

For this, it is advisable to narrow down the subjects to key experiences on the project. These are the topics you should deliberately cover in the workshop.

The basis for topic identification: hold talks with your participants and thus filter out the key experiences!

To obtain a selection of correct and vital topics, you can hold talks with the active participants. This is where the logbook comes in handy. After all – if the logbook keeps a good record – it provides everyone actively involved with a mishmash of topics to choose from.

From these talks, you subsequently select the most pressing and frequently mentioned incidents.

It is important to get a good mix of positive and negative aspects, since Lessons Learned includes both areas.

Make sure you obtain a good mix of positive and negative aspects when compiling the topics. This will keep all participants motivated.

Phase 4: Lessons Learned Workshop

All previous phases were geared towards the Lessons Learned workshop. The workshop is the highlight of the method.

It is where you and your team actively work with the experiences, deduct insights and obtain recommendations for action.

To begin with, let us look at the group of participants and the agenda.

The workshop should include the following participants:

  • All “actively involved” people
  • The project manager
  • Stakeholders (optional, but this will foster transparency and trust)
  • A moderator (optional but useful)

The moderator should be from outside the project and your group of “active participants”. This means he or she should not come from the project discussed in the workshop. This makes him or her a neutral person able to conduct the workshop without bias.

Ensure that the moderator of your workshop does not come from one of the projects discussed.

The agenda takes participants through the workshop and shapes it accordingly, as you can see in the example below:

  1. Welcome address & project presentation
  2. Round of introductions & expectations
  3. Introduction
  4. Rules
  5. Emotions
  6. Presentation of topics
  7. Analysis of topics & recommendations
  8. Result
  9. Next steps & transfer
  10. Round of feedback

1. Welcome Address & Project Presentation

The moderator opens the session and welcomes the participants. The agenda is presented.

As part of the introduction, the moderator briefly expands on the project, e.g. via a milestone plan.

2. Round of Introductions & Expectations

All participants briefly introduce themselves and state in which area or role they acted in the project. In addition, all participants mention their individual expectations of the Lessons Learned workshop.

It helps if the moderator takes down these expectations on a flip chart so that they can be referred to in the feedback round.

3. Introduction

The introduction gives the moderator the opportunity to elaborate on the approach. This ensures that all participants have the same knowledge level and clears up misunderstandings.

For instance, you can answer the following questions:

  • Why do we conduct this Lessons Learned workshop?
  • Who is the initiator?
  • What has been the preparatory work?
  • What is the focus?
  • What is the goal of the workshop?

Our tip: You could consider asking these questions in the plenum thus facilitating an exchange amongst the participants. This will lighten up the mood, as all participants tend to be very tense at the beginning.

4. Rules

Especially for Lessons Learned workshops, we advise you to introduce rules.

The reason?

Very often, the topics are emotionally charged. Rules support the participants and act as a guiding principle. The moderator can present these rules briefly and elaborate on the individual points.

The box below shows an example of workshop rules:

Sample List of Workshop Rules

Please note:

  1. Think in solutions
  2. I-statements (what have I learned; what would help me)
  3. No finger-pointing
  4. We are a team – hierarchies are dissolved

… and we’re allowed to laugh 😉

5. Emotions

After the first two introductory items on the agenda, it is time to begin the operational part of the workshop.

Use emotions to get started. For example, the moderator can ask the participants to portray their emotions regarding the project as a whole. These can be visualized centrally where everyone is able to see them.

For instance, the question could be as follows: What do I feel when I think of the project as a whole?

Overall, this will create a good overview of the project or rather its atmosphere.

Our tip: Use smiley cards to capture emotions. Alternatively, you could use a scale of numbers from 1 to 10. 1 for ‘really bad’ and 10 for ‘absolutely thrilled’. As smiley cards, you can just use Post-its or moderation cards, on which the participants can draw their emotion with colored pens.

Lessons Learned in Project Management 4
Simple smiley cards can be helpful where emotions are central

6. Presentation of Topics

Next, you present the topics which you or the team have selected during the talks in the preparation phase. You depict the individual topics to make them visible for all and provide a short explanation.

It is important that the plenum agree with the current choice of topics. Depending on the situation, you can now make changes.

Our tip: Always keep this point very open to debate. This allows the team to shape the workshop together and to put together the topics as a group.

7. Analysis of Topics & Recommendations

Analyzing the topics is the centerpiece of the workshop. This involves looking at the individual topics and working out recommendations for action.

To support the participants, you can revert to the central questions outlined below:

  1. Cause: How did this situation arise? What was the crucial factor?
  2. Effect: What was the consequence, the result, the corollary?
  3. Recommendations for action: What worked out well; what could have been better?

The central questions in the workshop: how did this happen, what was the consequence and what went well?

This part is a classic teamwork piece. It is possible to handle it in small individual groups or in the big group with the aid of the moderator.

Please keep in mind that recommendations for action do not only come out of negative situations. There are also successful incidents in projects that you can recommend for the future.

Watch out: There is no model solution!

As every project, every project progression, every project team is unique, the corresponding recommendations for action will also be individual.

Recommendations for action which are useful for one company may be practiced in a different way at another company. At yet another company, they may not be possible to implement at all due to the organizational structure.

But that is the beauty of Lessons Learned in project management: aspects and possibilities that are not in the textbooks may arise from workshop and teamwork.

Feel free to be creative in this respect! The only important thing is to achieve an actionable result.

For example:

  • A short daily stand-up meeting with the project team during the project phase to optimize the flow of information.
  • A different naming or structure for the project folders in the file store to simplify the search process for documents / information.
  • An improved formulation of the requirements and the prioritization. What can be helpful are custom-made templates based on the MoSCoW rule (Must / Should / Could / Won’t have). They make the stakeholders’ expectations more tangible.

 

8. Result

The focus of this part is on the results of the presentation of topics. Now, there is a constructive discussion of the topics in the plenum. What follows is their clear formulation and documentation.

The goal is for every recommendation for action to:

  • Make sense for every participant
  • Be meaningful and applicable
  • Find acceptance in the whole team

Work through the individual topics one after another. Thus, you end up with a recommendation for action for each point – ready to use for future projects.

9. Next Steps & Transfer

Once you have finalized the recommendations for action, it is necessary to settle the next steps. This could involve scheduling a follow-up meeting to discuss further points which have come up during the workshop.

Another interesting read: Why Have a Project Management Office (PMO)?

Moreover, you could address additional topics such as “communication” and “transfer of information”, e.g.:

  • How can we carry the recommendations for action into future projects?
  • Where and how can we file them so that other departments or project teams can use them?

Our tip: Pay particular attention to this part of the workshop! After all, it is where you decide how the information acquired in the workshop will be passed on to other departments and heads – hence it is essential for the PMO.

10. Round of Feedback

The feedback round is the conclusion of the Lessons Learned workshop. You are almost there!

This is every participant’s chance to recall the workshop and give feedback.

Likewise, the moderator can dwell upon the participants’ expectations taken down at the beginning of the workshop.

The session ends with the windup, i.e. the expression of thanks to the participants and the break-up of the workshop.

Conclusion – Lessons Learned in Project Management

Lessons Learned in project management is a good method for the conscious and sustainable generation of knowledge from experience.

In principle, the idea is to actively engage with the particular Lessons Learned topics or even create pivotal moments (aha effects). This will fix the knowledge better in the minds and support the learning effect.

In this article, you have learned about the most important aspects of implementing an exemplary Lessons Learned method. It has 4 phases:

  1. Informing and building the team (communication & assembling the team)
  2. Gathering phase (gathering of topics during the project)
  3. Workshop preparation
  4. Workshop

What is more, you have learned that Lessons Learned in project management always has to be individually adapted to the project at hand. Hence, there is no magic formula. Thus, it is important to see all examples used in the article as suggestions rather than as guidelines.

The benefit for you? Use this Lessons Learned guide to identify and implement potential for optimization in your projects!

In our experience, it has always been worth it. Have you had similar experiences?



Our final tips:

Get to know the individually adaptable “PPM Paradise” – the optimal environment for your enterprise-wide project, program, portfolio and resource management (PPM). Download the free eBook “The PPM Paradise” now (just click, no form).

And sign up for our bi-weekly blog newsletter with information on more hands-on articles, eBooks, etc. to improve your project management maturity level.

Any questions? We are happy to answer them and look forward to your comment in the comment field below.


Sonja Bannick – Lessons Learned in Project Management 3
Sonja Bannick, Project Expert and Blogger

About the author: In her over 25 years of professional experience, Sonja Bannick has worked in various positions. So far, she has gained experience as a founder, head of operations, senior business consultant and as a managing director in various industries.

Her core expertise includes holistic management consulting (strategy – people – organization – technology), managing teams and departments and developing them further. Project management has always played a central role for her.

Since 2011, she has been keeping her own blog on-operations in her spare time, in which she takes up topics from her business environment and describes her views.

 

Der Beitrag Lessons Learned in Project Management – How to Do It Right erschien zuerst auf Blog Project Management for Companies.

The post Lessons Learned in Project Management – How to Do It Right appeared first on ProdSens.live.

]]>
https://prodsens.live/2024/03/14/lessons-learned-in-project-management-2/feed/ 0
4 Tips for Greater Success in Internal IT Projects https://prodsens.live/2022/11/29/internal-it-projects/?utm_source=rss&utm_medium=rss&utm_campaign=internal-it-projects https://prodsens.live/2022/11/29/internal-it-projects/#respond Tue, 29 Nov 2022 13:09:12 +0000 https://prodsens.live/2022/11/29/internal-it-projects/ 4-tips-for-greater-success-in-internal-it-projects

As an IT department head or project manager, you know that internal IT projects have unique traits that…

The post 4 Tips for Greater Success in Internal IT Projects appeared first on ProdSens.live.

]]>
4-tips-for-greater-success-in-internal-it-projects

As an IT department head or project manager, you know that internal IT projects have unique traits that differ from projects involving other departments. One of the core requirements of an IT department is that it remains operational at all times.

After looking into what makes internal IT projects so particular and providing some general tips, this article will cover the following points:

Projects involving changes to the IT landscape are generally handled by employees who do this concurrently to their normal everyday work.

Internal IT projects are usual added to smaller operational tasks

In the IT field, parallel projects are added to numerous smaller operational tasks

Other unique aspects affecting IT team leaders and their employees:

The IT environment is very dynamic with carefully timed processes at very brief intervals.

  • New skills are often required on short notice.
  • The portfolio tends to include a greater number of small projects and just a few larger ones.
  • A clear distinction between operations and projects is often lacking.
  • IT tasks are increasingly being managed using agile methods, and this has a major impact on project management.
  • The IT department exists to serve others, which is why its costs are almost entirely charged to the departments it serves.
  • IT employees normally use a task-oriented planning tool or ticket system. For maximum efficiency, this tool or system should be integrated with the project management tool.

Before discussing possible solutions, however, we would like to share two important tips:

Define Clear Criteria for Your Projects

In many IT departments, the belief prevails that many assignments – even larger ones – can be handled in addition to the regular daily operations. In doing so, there is the danger that these assignments will miss their deadlines – or will not get done at all.

Find out how agile methods can help reduce resource conflicts in projects in this article.

So, it is important to have a clear understanding among all the participants as to whether this assignment is an operation or in reality a project with all its related processes.

Our tip: Conduct a project-worthiness analysis to determine under what conditions an IT proposal should be handled as a project and define the types of projects.

Doing this increases your chances of success because the assignments will no longer be handled “on the fly.” Classifying something as a project has its advantages: the objectives and roadmap are clearly defined, the necessary resources are allocated, and decisions are made.



Keep Everyone in Sync

Agile methodology is very popular in the IT industry. Unlike normal project planning, agile projects involve processes of differing lengths. Resource management is more complicated due to the different durations of the processes. We therefore recommend that you try the following.

Our tip: Try to subdivide your IT project processes into work packages that can be performed according to a fixed schedule of phases.

Allocating a consistent set of resources to each project phase helps ensure that team members are able to seamlessly switch between project work and their normal duties. Doing this will significantly reduce the amount of effort needed to coordinate all the resources.

Project management with fixed resources allocated to each phase

Project planning with fixed resources allocated to each phase

You might also like: Comparing PM Methods – Agile, Traditional or Hybrid?

4 Solutions for Greater Success

In the following sections, we present solutions for four areas especially critical for heads of IT. These are IT project portfolio management, internal cost allocation, comprehensive team planning and, finally, personalized task planning.



1) IT Project Portfolio Management

Project portfolio management is particularly important for IT. It is not unusual for several hundreds of projects to be handled in one year. This requires a clear strategy, and the projects must be prioritized accordingly.

Benefit: The most important criteria for project portfolio management are:

  • Priorities: you ensure that you focus your efforts primarily on the right – and most important – projects.
  • Complete overview: you stay informed on all planned and current projects.
  • Available resources: you can identify any resources available for initiating and performing additional work on any new projects.
  • Strategic foresight: you can anticipate what expertise and / or skills will be lacking or insufficiently present in your company and can proactively work to develop these.
  • Early warning system: you can detect budget and / or resource bottlenecks in a timely manner and can adapt your corporate strategy accordingly.

Goal: Ensure that you receive a prioritized list of the projects and that most of the resources are allocated to the key projects. There are various approaches and tools for handling this. Please also consult the article outlining 7 steps to project portfolio management.

One solution approach: One way to integrate new projects into a portfolio with regard to resource planning is depicted in the following diagram.

In this Microsoft-based solution, the bars used to represent the various projects can be shifted on the timeline. The histogram depicting each department’s resources shows the available capacities and whether the necessary resources are available to handle this project in the specified time frame or if the project should be postponed or the available capacities adjusted.

TPG PortfolioManager helps optimize resource utilization

Portfolio planning to optimize resource utilization (via TPG PortfolioManager)

Find out how the internal IT of a large Swiss healthcare facility solved their PM system challenges with TPG’s new and advanced ProjectPowerPack (Case Study).

2) Integrated Cost Allocation

The actual cost of the IT services should be documented accurately and be allocated (as far as possible) to the departments benefiting from these services. Many smaller companies often have no idea how much these internal IT services actually cost. Yet, larger companies are generally aware of the actual costs.

Benefit: Integrating the project management and ERP systems has its advantages, such as:

  • Alignment of the PM and ERP system architectures
  • Support for planning and monitoring the IT budget
  • Allocation of services to the various cost centers
  • Avoidance of dual data entry
  • Timely availability of data, thereby enabling better control of the IT projects
  • Higher quality data

Goal: Ensure that your key systems are integrated so that as many processes as possible can be automated.

Solution approach: Important use cases involving the integration of PPM and ERP systems plus other systems in the IT landscape are:

  • Adding selected projects to an ERP system (such as SAP) from e.g. a SharePoint list and the resulting creation of a project structure in the PPM system (such as Microsoft Project) using a template appropriate for that type of project
  • Transferring the PPM system’s project structure to the ERP system
  • Transferring the PPM system’s tasks and costs to the ERP system
  • Transferring the current work by cost center and type of service from the PPM system to the ERP system for further internal invoicing
  • Transferring the actual costs from the ERP system to the PPM system for reporting to the project manager
Transfer of tasks and costs between PPM and ERP systems – Great for internal IT projects

Example of the transfer of tasks and costs from the PPM to the ERP system (via TPG PSLink)

Our tip: Use short interval processes to track the IT services. Ensure that this work is charged to the right cost centers.

The volume of projects has a significant effect on the data quality. Projects exceeding a certain size therefore require a PMO to coordinate the efforts and maintain an overview to ensure the project’s success.

3) Comprehensive Team Planning

For IT in particular, handling the many operations associated with daily operations while simultaneously managing projects involving the same staff is a major challenge. This is only possible if the entire team is working at full capacity. PPM tools are unsuitable for operational planning, and Excel is only minimally suited.

Benefit: The advantages of comprehensive team planning are:

  • A clear overview of resource utilization in the team
  • The project manager and team leader have a basis for the coordination efforts.
  • Team leaders have the data they need to explain resource utilization in the team to their supervisors and can explain the status of each team member: who works when, on what and for how many hours; who has the capacity to take on new tasks and who needs to be relieved of some tasks.

Goal: Provide your team leaders with the tools necessary for precise planning, which will allow them to say with certainty whether or not their team can contribute any resources when asked by their project manager. The document “3 Important Points for Tactical Resource Planning” linked below provides more information on this.

Special Download: 3 Important Points for your Tactical Resource Planning (PDF file)

Please fill in the form.
* Required Fields  |  Data Protection

This form is blocked by your cookie settings to our website. Please click here and select at least the marketing cookies. Then this form will be visible. Thanks a lot.

Solution approach: To ensure that you achieve complete planning in the matrix organization, please note the following:

  • The planning is only complete if there are no gaps, so make sure you include all absences, operations and project work for every team member.
  • Only team leaders can handle this because project managers do not have the necessary insight.
  • The availability of a resource to work on the project can be calculated by subtracting any absences and operations from the person’s overall capacity.
  • Project managers and team leaders each need their own planning status. Depending on permissions, each should be able to view the other’s planning status but not to alter it. This allows each role to work separately from a technical perspective.
  • The best strategy is to implement a centralized, database-supported tool that enables project managers and team leaders to work efficiently.
Handling resource requests and approvals with a tool for comprehensive team planning (TPG TeamManager) works for internal IT projects

Handling resource requests and approvals with a tool for comprehensive team planning (TPG TeamManager SharePoint app)

4) Work Planning for Individuals

Have you ever considered involving the employees in planning an IT project? After all, they are the ones who will be doing the work to implement the work packages. Project managers are often unable to correctly estimate the time needed to complete a particular task because they are not familiar with the work of these IT specialists.

Benefit: Allowing the employees to participate in work planning has several advantages:

  • The project manager defines the project’s structure with its work packages, and then the team handling the work plans the individual tasks in these work packages using a tool suitable for them.
  • The result is not some rough estimate but rather a realistic plan for the project.
  • This frees up the project manager’s schedule because the details are defined in the task lists of the individual work packages.

Goal: The employees use various tools during the IT project. The goal for individual work planning must be to integrate these systems. Ideally, each individual should work with only ONE tool.

You can achieve this by integrating the employee’s work management tools (such as Jira) with the project manager’s PPM tool (such as Microsoft Project and SharePoint). Learn more in the article about integrating PPM with Jira.

Solution approach: Possible use cases for the integration of Microsoft Project and SharePoint with work planning (in this case Jira) are:

  • Synchronize the Microsoft Project structures with Jira
  • Enter the issues and estimates into Jira
  • Import the standard issues from SharePoint into Jira
  • Synchronize Jira and Microsoft Project to input the progress from Jira
Transferring items, actual times and status from Jira into Microsoft Project (via TPG PSLink) can help in internal IT projects

Transferring items, actual times and status from Jira into Microsoft Project (via TPG PSLink)

Conclusion and Recommendations – Tips for Greater Success in Internal IT Projects

Internal IT projects have unique attributes that make them different from projects in other departments. This article has explained some of the differences.

We have also provided possible solutions to help you master project portfolio management, internal cost allocation, comprehensive team planning and personalized task planning.

If you would like to know more about our solution approaches, check out the PPM Paradise.

Did you enjoy this article, and do you have any feedback for us regarding the management of internal IT projects? We look forward to your comments.


Johann StrasserAbout the author: Johann Strasser, a certified engineer, has been a managing partner at TPG The Project Group since 2001. After many years as a development engineer in the automotive and energy sectors, Johann Strasser spent a decade as an independent trainer and consultant in the field of project management. During his tenure, he also served as project manager for software projects in the construction industry and provided scheduling and cost management support for large-scale construction projects. At TPG, he applies his expertise in product development and consulting services for international clients. His special focus is on PMO, project portfolios, hybrid project management, and resource management. For many years now, he has shared his knowledge through presentations, seminars, articles, and webinars.

You can read more about Johann Strasser on LinkedIn and XING.

Der Beitrag 4 Tips for Greater Success in Internal IT Projects erschien zuerst auf Blog Project Management for Companies.

The post 4 Tips for Greater Success in Internal IT Projects appeared first on ProdSens.live.

]]>
https://prodsens.live/2022/11/29/internal-it-projects/feed/ 0